Part design and construction of the elevated viaduct for a length of 4528m plus Four Track, Three Track, Two Track configuration and Single Track Shunting neck at Koyambedu Station and Depot Entry of Corridor - 2, Phase - 1 of Chennai Metro Rail Project.