Construction of Elevated Highway Project on Bengaluru - Hosur Section of NH-7 from Silk Board Junction (Km. 8/765 to 18/750) to Electronic City Junction on BOT (Toll) basis. The Elevated highway is about 9 Km. long.

|
|
|
|||
| CAREERS WITH SOMA | ||
|---|---|---|
|
||
|